ds
    

Future Plans


PROPOSED SWINING POOL


we propose a Swimming Pool for our school joining with old boy association.We have planned to construct rectrangular Swimming Pool with 8 track near by school play ground.Construction will be in 3 stages and overall project will end in year 2021.

 

PROPOSED CRICKET/ATHLETIC/FOOT BALL GROUND


We propsed a very facilitated play ground with 3 sub Cricket/ Athletic/Athletic grounds pavillian.Construction will be in 3 stages and overall project will end in year 2025.

back to top

PROPOSED OPEN THEATER


 

back to top

PROPOSED CCTV CAMERA SYSTEM


we propose a CCTV Camera System for our school. We have planned to mount it as covering hole school premises.Placements will be in year 2018.

back to top

PROPOSED AUDITORIUM


we propose an Auditorium for our school joining with old boy association.We have planned to construct it to facilitate 2000 students at once with air conditioned suround, mega Full HD screen and comfurtable side arm chairs. Construction will be in 3 stages and overall project will end in year 2028.

back to top

PROPOSED MAIN ENTRANCE


 

 

 

 

 

 

Future Plans


  • Proposed Swiming Pool
  • Proposed Cricket Ground & Pavilion
  • Proposed Athletic ground
  • Proposed Foot ball Ground
  • Proposed Open Theater
  • Proposed CCTV Camera System
  • Proposed Auditorium
  • Proposed Main Entrance